Disaster Support
Our Support Services
Frontline Medical has the immediate capacity to construct multiple base camp facilities with capacities ranging from 50 to 5,000 occupants. We provide needed campsite infrastructure improvements. Frontline Medical has the staffing capabilities to operate and manage these camps professionally and provide camp assets that can be expanded or reduced based on mission needs and camp population. We provide site design and scheduling to provide effective campsite planning and use.
Our Clients
Frontline Medical works with local, state, and federal agencies in California and across the United States. Some of our clients include the California Department of Forestry & Fire Protection, USDA Forest Service, Department of Interior's Bureau of Land Management, US Fish & Wildlife Service, Bureau of Indian Affairs, the US Military, Department of Homeland Security, and FEMA, as well as private entities.
Some of Our Deployments
Frontline Medical has provided hurricane relief services during the devastation of Hurricanes Katrina, Rita, Ike, Gustav, Irene, Isaac, Matthew, Harvey, Maria, Irma, Florence, and Michael. We have also provided medical support to countless wildland fires throughout the Western US, COVID vaccination support, and immigration support.
We adapt our presence to meet your needs
Patient Housing
The GK-1935 meets the needs of a facility to offer initial control/entry and protection of a medical support unit, hospital, initial triage, patient registration, administration, outpatient support, record keeping, command center, staff quarters, common area, sleeping, etc.
19' x 35' Framed YURTS
This Western Shelter 1935 tent has 570 square feet of usable floor space. In an all-hazard response situation, the GateKeeper I-1935 (GK-1935) can assist first responders as a shelter solution in emergency healthcare, law enforcement, disaster medicine, urban search & rescue, disaster mortuary, disaster veterinary, and more.
Climate Controlled
Estimated set-up time: 60 minutes to 2 hours each (more time may be required depending on ground preparation). Units can be connected together to increase square footage. All units are HVAC climate-controlled.
Bright Interior
White interior, LED lighting, 24 power outlets, and HVAC ducting.
20' x 32' with Vestibule
Estimated set-up time: 30–60 minutes each (more time may be required depending on ground preparation). Units can be connected together to increase square footage. All units are HVAC climate-controlled.
Patient Housing
Diverse patient beds, vital sign monitors, privacy curtains, and a one-piece floor prevent contamination.
Featured Categories
Medical Support
Disaster Support
Leadership / History